Despite COVID, progress is being made with the Stow pump track project.
The feasibility study is underway. Part 1 of the flood risk assessment has been completed and the flood modelling results are being used to inform the design of the pump track. This week – beginning 4th March 2021 – should see on-site percolation tests and investigation of water table levels carried out. This will require a digger on the site.
We had a great response to our recent user survey and we will share results when analysis is complete.